Skip to main content
+44 (0)1264 731200sales@forcetechnologies.co.uk
Force Technologies

What are the biggest engineering mistakes when reacting to obsolescence under time pressure?

20 April 2026 · 51s

The answer

When time is running out and millions are on the line, the biggest engineering risk isn’t delay, it’s counterfeit components.

Under pressure, teams scramble to source parts fast. Even companies with strict quality standards can be tempted to step outside authorized channels.

But that’s where the danger rises. Non-franchised sourcing significantly increases the risk of counterfeits, putting your entire project at risk.

Speed matters. But quality and traceability matter more.

This short video is part of our ongoing series of Tech Talks and features in the latest episode - Five Critical Quest

These quick answers are drawn from our Force Tech Talk podcasts. Have a specific obsolescence challenge?

Talk to our team
All quick answers

Download our White Paper

Resolving obsolete component shortages using die extraction from plastic packages and re-assembly into ceramic or alternate plastic packages

Download